Tender notice for construction of municipal trunk line and urban street lamp renovation project


Tender No.: TZA2009----07018
Tendering Agent: Tongzhou Tianyuan Construction Supervision Consulting Co., Ltd. Owner: Nantong Tongzhou District Construction Bureau Registration Deadline: 2009-07-16
Region: Jiangsu Industry: Water Conservancy Bridge Construction, Electrical and Electronic Appliances

1. Project Name: City and Town Main Line of Tongzhou District, Nantong City and Urban Street Light Reconstruction Project (Construction)
2. Project Overview:
(1) Approval number:
(2) Investment amount: about 5.74 million yuan
(3) Project location: Tongzhou District
(4) Quality level requirements: one-time acceptance
(5) Planned opening and completion time: August 1, 2009 - September 30, 2009
3. Classification of bidding sections: The bidding is divided into five bidding sections. The serial number of the bidding content The estimated size of the construction scale contract (10,000 yuan) Applicant qualification category and level of project leader
TZA20090701801 Renmin East Road and other street lighting renovation 110 City and road lighting engineering professional contractor level and above qualified municipal public works or mechanical and electrical security professional level and above registered construction engineer or registered electrical engineer
TZA20090701802 Cuiyuan South Road and other street lighting renovation 85 City and road lighting engineering professional contractor level and above qualified municipal public works or mechanical and electrical security professional level and above registered construction engineer or registered electrical engineer
TZA20090701803 Tonghai Road Street Light 76 City and Road Lighting Engineering Contractor Class and above Qualified Municipal Public Works or Mechanical and Electrical Safety Professional Class and above Registered Construction Engineer or Registered Electrical Engineer
TZA20090701804 Eight-corner pavilion west side road and other street lighting renovation 170 City and road lighting engineering professional contractor level and above qualified municipal public works or mechanical and electrical security professional level and above registered architect or registered electrical engineer
TZA20090701805 riding stone road and three stations and one bridge street light 133 urban and road lighting engineering professional contractor level and above qualified municipal public works or mechanical and electrical security professional level and above registered architect or registered electrical engineer
4. Performance conditions for registration of enterprises and project managers:
1 Applicant's performance and reputation: in the past three years, it has similar project performance, strong economic strength and good reputation;
2 Project leader's performance and reputation: obtained similar project performance certificate (contract and bid winning notice) in the past three years.
5. Other registration conditions: (1) The project only accepts online registration. For details, please refer to the “Tendering Online Operation Instructions for Bidding Units” in Tongzhou City Bidding Information Network; (2) Implementing Su Jianzhao (2006) No. 372; (3) Each Applicants must apply to participate in the registration of the above five tenders, and limit one of them.
6. Information required for pre-qualification: (1) Application form for bidding for construction of Nantong City (three copies of the online registration and stamped with the official seal of the official seal) and three copies of the ID card of the applicant; (2) The following originals must be provided for the submission of prequalification materials: a. The power of attorney of the manager. b. The business license of the enterprise legal person of the bid applicant. c. Applicants must have the qualifications of the city and road lighting engineering contractor level and above. d. It is required to submit a registered public engineer or a registered electrical engineer (including temporary) or registered electrical engineer at the municipal public works or mechanical and electrical safety level registered above the bid application unit. e. Effective labor contract and recent social insurance for the registration manager, authorized agent and project leader. (3) The full version of the prequalification document is downloaded by the bidder through the Tendering Information Network of Tongzhou District, Nantong City ( Download Center, page 4). (4) Only one prequalification document is required for the five tenders.
7. Registration, qualification, and lottery time and place:
1 Registration time: July 10, 2009 to July 16, 2009; online registration for 24 hours or Nantong Tongzhou District Bidding Management Center information hall computer online registration (working day 9:00-17:00).
2 Qualification time: 9:00 to 11:00 on July 17, 2009 (when it is not signed, the applicant will automatically waive the trial and processing, and submit the information required by Article 6 of this announcement at the time of prequalification. Supplementary information, only the performance in the enterprise warehouse is recognized in the pre-qualification); Venue: Registration Hall of Tendering and Bidding Management Center of Tongzhou District, Nantong City [Tongzhou District Tendering and Bidding Management Center of Nantong City Address: West Side of Building 4, Tongzhou District Administrative Center, Nantong City ]
8. The project bidding adopts the evaluated minimum bid price method, which can meet the substantive requirements of the bidding documents, and the bidder with the lowest bid price is the winning bidder, except that the bid price is lower than the cost. The specific rules are as follows:
1 bid quotation score (90 points): The effective quotation means that the bidder's quotation is lower than the bidding control price set by the bidder. If the difference between the lowest quotation and the second lowest quotation [(lower quotation - lowest quotation) / second quotation] is more than 5% and above, it is regarded as the quotation extreme value, which is invalid quotation. Bid basis price = the lowest bid price evaluated in each bidder's effective quotation, except where the bid price is lower than the cost. The bid price of the bidder is equal to 90 points of the benchmark price of the bid evaluation; the bid price of each bidder is compared with the benchmark price of the bid, and 1 point is deducted by 1%. For less than 1%, the insertion method is used, and the score is retained after the decimal point.
The score of the deviation of the unit price of the part of the project is divided into two points (10 points). Due to the incompleteness of the disc data, the clearing of the label is a scrap. The deviation error is within ±15% (including ±15%) without deduction, exceeding ±15%, each item is deducted by 0.02 points, and the maximum deduction is 4 points.
If the bid price is lower than the average of the valid bid price by more than 5%, the winning bidder shall also submit the bid balance margin to the bidder separately before the contract is signed according to the difference between the bid price and the average bid price.
9. The bidder must submit the bid bond in the name of the enterprise legal person. The bid bond must be paid from the corporate basic deposit account of the enterprise. The bid bond paid in the name of an individual, a company's office, a branch, or a subsidiary or from another account or other account of the bidder's business is invalid.
10. If the potential bidder determined by the pre-qualification does not obtain the bidding documents or abandon the bid after obtaining the bidding documents, in addition to the case of force majeure, the information shall be announced on the information website of the district bidding and bidding center for 3 months. During the announcement period, the tenderers of other government investment projects may not accept their bids accordingly.
11. Determine the bidder's method: scoring ranking; all the qualified candidates will be drawn; all qualified candidates will be shortlisted.
12. The total cost of the bidding documents, drawings, CDs and other materials of the project is RMB. See the bidding documents for the whole amount; the total amount of the bidding guarantees is RMB.
13. Agency: This project is entrusted by the owner of Tongzhou Tianyuan Construction Supervision Consulting Co., Ltd. to be responsible for the tendering of this project.
Tenderer: Nantong Tongzhou District Construction Bureau Address: Xinjin East Road, Tongzhou District, Nantong Contact: Wu Delin Telephone Fax Tender Agency: Tongzhou Tianyuan Construction Supervision Consulting Co., Ltd. Address: No.43, Traffic Road, Tongzhou District, Nantong City Contact: Yu Zhenfei telephone / fax

Microwave Sensor Light

Sensor Light,Microwave Sensor Lights,LED Sensor Light

PIR Sensor,E-LIGHTING Wall&Ceilling Co., Ltd. , http://www.chceilinglight.com

Posted on