Shanghai first reduced landscape lights time National Day only opened 5 days


During the National Day, the landscape lighting of Shencheng will be a big energy-saving card. It will be shortened from 7 days a night in the long holidays to 5 days. This is the first time that the Shanghai department has reduced the long-term lighting time.

The specific lighting time will be from September 28th to October 2nd (Sunday to Thursday) every night from 18:30-23:00, when the public and tourists will appreciate the beautiful scenery of the fire tree.

It took 2 hours to enjoy the lantern

During the 5-day National Day holiday, the opening lights of Shencheng are the night lights of all districts and counties in the city, including temporary lanterns, lighting essays, building lighting, outdoor advertising lighting and main commercial street window lighting.

Except for the opening and closing time of the window light, it is still carried out according to the original regulations. The other lights are adjusted from 19:30-22:00 to 18:30-23:00 from July 24th. The visitors enjoy the light time more than before the festival. More than 2 hours.

However, the relevant person in charge of the city appearance and environmental sanitation bureau said that during the National Day this year, the landscape lighting will be a big energy-saving card. Except for the first reduction to five days, it will not bloom everywhere when choosing the open area, mainly concentrated in tourist attractions with large crowds. Commercial areas, etc., and the main features of ornamental pieces, combined with light and dark, not concentrated, to achieve environmental protection and energy saving effects.

In addition, the Municipal Bureau will open the light fence of the west section of Yan'an Road Elevated Road, the Yan'an Middle Road Elevated and the inner ring elevated blue channel lights, the inner ring Humin elevated interchange green guardrail lighting; Pujiang Bridge and Tunnel Company's open wind tower lighting, Yangpu Bridge, Nanpu Bridge Lupu Bridge lights.

Pujiang landscape lights will be replaced

In addition to adjusting the time and area for the opening of the landscape lights during the National Day, the city appearance department said that it will strengthen the energy-saving technology transformation of the landscape lights, and gradually replace the traditional light sources with new energy-saving light sources such as LEDs and electrodeless lamps. At present, most of the landscape lights on both banks of the Huangpu River It has been remodeled and will be replaced before the Expo. At that time, the Pujiang night scene will be more beautiful and rich.

From the National Day lighting event, Shencheng will enter the winter lighting stage, and the opening period will return to normal 18:30-22:30 every night after the event.

Domestic LED lighting wants to be the leader, but the level is still heavy 2008-09-27
Xi'an Wall Landscape Light is brighter for 1 hour this year on National Day 2008-09-27
Chinese red lanterns hang high on Myanmar Lantern Festival 2008-09-27
Summary: What does the Olympics bring to the Chinese lighting industry? 2008-09-27



1

Turnkey PCB Assembly =  turnkey Printed Circuit Board Assembly, which means turnkey service for PCB Assembly job. Customer no need to care anything but to send all files to us. Zhongfeng would manufacture the rigid PCB boards follow the design file, source the components follow the BOM file and do the PCB assembly job follow the assembly drawing and the pick&place file. After PCB assembly done, the components would be mounted on the PCB boards tightly and connected each other through the copper circuits. We call such board as PCBA board or rigid custom PCBA board.

 

Depends on the components assembly types, it have THT PCB assembly, SMT PCB Assembly , one sided SMT and THT PCB assembly, two sided SMT and THT PCB assembly.

 

Depends on the PCB type, it have Rigid PCB Assembly, Flex PCB Assembly and Flex-Rigid PCB Assembly.

 

Also we would call some PCB assembly types as Prototype PCB Assembly, Mass PCB Assembly , Turnkey PCB assembly, LED PCB Assembly and BGA PCB Assembly , etc.

 

With our 15years professional experience, we are available for all types of PCB assembly service from prototype to mass production, available for 01005, 0201, 0.3mm BGA, 0.3mm QFP.


PCB Assembly Capabilities

Quantity

1 pcs - 1,000,000 pcs

Assembly type

SMT, THT or Hybrid

Parts procurement

Full turnkey (ZhongFeng provide all components)

Partial turnkey ( Customer provide the main components and ZhongFeng provide the rest)

Kitted (Customer provide all components)

Component types

SMT 01005, 0201, BGA 0.3mm pitch, QFP 0.3mm pitch, etc.

Test

Visual Inspection, AOI, Custom testing, ICT, FCT, Test jig




PCB Assembly Products Show


PCB Assembly Boards


PCB SMT Assembly Factory Show


ZhongFeng SMT Factory


ZhongFeng SMT Factory

Turnkey PCB Assembly

Turnkey PCB Assembly,Turnkey PCB Assembly Service,One-Stop Turnkey PCB Assembly,Turnkey Circuit Board Assembly

ZhongFeng Electronic Technology Co., Limited , http://www.1pcbassembly.com

Posted on